Tuzla County General Road Arrangement and Joint Infrastructure Cons

In Tuzla district of İstanbul province, road infrastructure and infrastructure project has been provided to solve the problems of infrastructure in Tuzla district.

Within the scope of the project, 9932 m long wastewater and 6703 m long stormwater was produced.

Şifa Neighborhood, which is located at the border of Istanbul with Kocaeli and has an important place in the name of urban transformation; 2274 m long double lane road construction, 2938 m long drinking water production and 3955 m long electrical lighting manufacturing and then completed in the region thanks to the mass housing construction has gained a new, regular living space and transportation opportunities.

In Aydınlı region, regular and safe traffic circulation was ensured thanks to Konaşlı Junction, which is composed of 6345 m long (2 x 2) stone walls, 97.323 tons of unadorned stone fill and 2938 m2 of landscaping. In addition, 3170 m long creek breeding activities were completed successfully.