T.C. Antalya Metropolitan Municipality ASAT General Directorate
The culture and tourism temple of Antalya, which introduced our country to the world, was experiencing serious infrastructure problems due to the intensity of seasonal rainfall.
With the decision taken within the framework of the Emergency Action Plan, Dumlupınar Bulvarı, which is one of the important arteries of the city, was completely free of this problem with the rainwater drainage channel project.
The project, which was successfully completed by our company, was implemented under the supervision of ASAT General Directorate.
Within the scope of the project, 9.000 m culverts were produced in different sizes starting from 1.5 x 2 m dimensions and ending with 4 x 4 m dimensions. In addition, a double eye cast bridge with a length of 32 m and a length of 4 x 4 m was manufactured. In addition, the extension and extension of the river bed of a 650 m long stream were successfully completed in the present project.